Sunday, February 10, 2008

Average Wedding Cost 2010



Exterior:

The space for the garage and is ready for the balcony.

Inside:

The water meter is connected (we now have water). The
Screed dries and single rooms are already smoothed. Already use the woodchip wallpaper on the ceiling is painted finished.


What is happening:

is papered.
We are waiting for the garage.
... and we have purchased 40 square paving slabs for the patio.

0 comments:

Post a Comment