Hand Gesture With Thumb, Pointer, And Pinkie

interior

Hello!

The artisans were busy.
The roof is sealed.
The windows are now all in there, and the basement windows.

the bathtub and the shower are already in the right place.

The heater is installed and the electrical system is almost ready. We can even hang some light fittings. Switches are already available and the blinds go by, we can already switch control up and down.

The kitchen was measured on Saturday.

Now we hope that this week, water and power down the house.


Here are some pictures:

Such was the living room just before Christmas From:

















Thus, the living room looks now:
















This is our heater in the basement:
















This is the upstairs bathroom (with bath)