airing
the moment we have to ventilate the house to dry the screed.
The first day it was like a sauna. Meanwhile, the moisture is no longer as high.
What else is new:
Stadtwerke were there and have electricity, water and telephone set.
Now we have the current in the meter box be placed, as well as electricity and water meter installed Tough. The water meter shall not be brought if the bill is paid. And this bill is peppered up! (Monopoly)
The screed is already polished. In any event, at the places where our tiler lays the tiles. We have two pallets hauled tiles in the basement.
the tile like our house, incidentally, very good.
Next steps:
This week will be filled.
It must be lifted.
We are planning a crossing step. This will continue until the road is completely finished, including sidewalk. Only then will we know for sure how high can the stairs. And our
Burrows must prepare the ground to make the garage.